requestId:6877d175cd0f83.57876428.
Beijing Star Energy Network has reported that on May 28, the third batch of competitive setting and installation equipment for the third batch of new dynamic projects in Kongtong District, Pingliang City was released. The total scale of this competitive setting and installation equipment is 150,000 kilowatts, and a total of 2 radio projects are matched at the same time. The installation equipment is set to Xiyang, Kongtong District-Daqin 10 The 10,000 kilowatt wind project and the 50,000 kilowatt wind project in Kongtong District, the project supporting capacity is no less than 10% of the project size, and the energy storage time is no less than 2 hours. That is, the two projects are equipped with 10MW/20MWh and 5MW/10MWh respectively, and the total capacity is 15MW/30MWh. The document points out that enterprises are encouraged to adopt a shared energy-enabled approach. If the energy storage ratio does not meet the minimum request, it shall not be used for this competition.
Notice on the competitive setting and installation of the third batch of new dynamic projects in Kongtong District, Pingliang City
1. Competitive configuration conditions
In accordance with the “Guidelines for competitive setting and installation of Gansu Risk-Saving Photovoltaic Power Generation Project Escort Manila Programme, “Gansu Province New Power Construction Indicators Distribution Measures (Trial)”, “Gansu Province Promoting the Development Evaluation Measures (Trial)” and the Municipal Development and Reform Commission’s “Notice on Implementing the Construction of the Third Batch of New Power Projects in the 14th Five-Year Plan”Sugar daddy TaskSugar daddySugar daddySugar daddySugar In the finest form of the document daddy‘s case, the matter is indeed like a dream. The beekeeper of Ye Qiuguan has broken down. I am entrusted by the Development and Renovation Bureau of Kongtong District, Pingliang City. Gan YongzhengManila escortInformation Project Governance Co., Ltd. is the consulting unit. The notice of the competitive installation and installation of the third batch of new dynamic projects in Kongtong District’s “14th Five-Year Plan” is announced as follows. We are interested and qualified qualifications. href=”https://philippines-sugar.net/”>Sugar baby, enterprises with sufficient investment and technical capabilities participate in the project application.
2. Overview of competitive projects and scope of competitive scope
1. Project name: Competitive installation and installation of the third batch of new dynamic projects in Kongtong District, Pingliang City.
2. Competitive configuration scale: The total scale of this competitive setup is Pinay escort150,000 kilowatts, with a total of 2 wind projects that are used simultaneously.
3. Competitive scope: After the application is closed, third-party organization experts will conduct competitive
Set the installation and design evaluation task, and determine the investment subject based on the review results. After the selection, it will bear the price and risk by itself, and is responsible for the project design, investment, construction, and operation and maintenance tasks after the project is completed. According to Sugar baby, the new power support strategy for Sugar daddyCatalogue of Development of New Energy Industry (Trial)”, a new dynamic project and a marketing mechanism for matching with negative loads of electricity, has been added to the new production capacity of wind power generation key components, new nonferrous metal information, and thermal energy industry. The cooperation projects that have participated in the matching indicators in other years will not be deemed to be included in this matching power supply Pinay escort project.
4. Project construction progress request: Complete project approval before August 31, 2024, and start construction and complete the entry into the warehouse before October 31, 2024. After the verification period expires, the company has waived the right to open the project and has undertaken everything from Sugar baby to issue construction indicators by the installation and installation platform. After the start of construction, the project will be removed from the third batch of new dynamic project construction plan of the city’s “14th Five-Year Plan”.
5. Business period and Internet price: The competition items are market-based and Internet items, and the business period and Internet price are implemented in accordance with the national applicable policies.
6. Energy storage system request: The project supporting capacity is not less than 10% of the project size, and the capacity is not less than 2 hours. We encourage application enterprises to adopt the shared capacity method. If the energy storage ratio does not meet the minimum request, it shall not be used for this competition.
7. Project changeAnd it is possible to make: the project shall not change the project name, site, investment scale, construction schedule, construction scale and other important construction contents during the entire construction period. Within three years after the new dynamic project is completed and operated online, selected enterprises shall not change the investment entities and shareholding ratios through transfer, equity changes, reselling, etc.
3. Application for enterprises
1. Application entity Sugar daddy should be an enterprise registered in the People’s Republic of China or registered in accordance with the law, and has the qualifications of an independent legal person.
2. An enterprise can only apply for at most one mark in all the bidding sections of this competition. The legal representative of the applicant is a unified person or a full-funded subsidiary or holding subsidiary that has interspersed with equity, all applicants are considered to be a unified enterprise body.
3. This competition will receive joint applications, but the number of joint members shall not exceed 2. The joint body must clearly establish the enterprise, and each joint body is required to undertake actual investment in the joint body and be accompanied by a joint agreement.
4. As of December 31, 2023, the proportion of total investment in enterprise investment and risk projects applied for shall not be less than 25%. In the case of a joint application, the assets of each member of the joint member shall meet the above requests.
5. Other requests:
(1) The applicant’s enterprise has not been subject to relevant governance for violating the “Bidding and Investment Law of the People’s Republic of China”, “Procurement Law of the Administration of the People’s Republic of China”, and “Escort” and “Escort” “Oh, then your mother should be very excited when she knows it. Sugar baby” The neighborhood is feelingSugar daddy said, “The department may have punished the company’s important debtors to be punished by criminal punishment.
(2) The company has not had serious disputes, or has serious or above relatives, and its name is Chen Jubai. A relative said that he has good relatives, has a stable income and production, or has severely arrears of agricultural workers.
(3) The company has not been disclosed by the national enterprise trust information (.cn/index.html) List the list of companies with serious and serious rules.
(4) The applicant company has not been in the state of being held responsible for suspension of business, suspended or revoked investment qualifications, accepted property, destruction, and destruction.
6. For a joint application, each member of the joint shall meet all the above requests.
IV. Acquisition of matching files
1. The acquisition time of matching files is: EscortMay 28, 2024 to June 1, 2024.
2. Obtain information on matching documents: business license, Escort account permit, legal person component certificate and legal person authorization letter, and submit two sets of copy of all application data (need to add the official seal of the enterprise and the seal of the legal representative).
3. Companion documents will be distributed in paper format and contact the consultation unit to obtain them.
4. When handling the acquisition of matching documents, please apply according to the matching documents. The company must know the content and indicate the matching number of the applied items in the preparatory column/summary column, and at the same time indicate the company’s simplification and use.
5. When submitting the exchange of the matching guarantee, please apply for the company according to the matching document, indicate the matching number of the applied items in the preparatory column/summary column, and indicate the flashlight of the heroine. Company simplified and TC: