未分類

Jiangsu Kunshan: Free planning permit for box-type energized facilities projects, Sugar daddy, construction permit

requestId:6878d96c6b1919.40297662.

Beijing Star Energy Network reported that on June 24, the Kunshan Municipal Bureau Office issued the “Kunshan City Optimization Business Environment 2024 Innovative Implementation Plan” (hereinafter referred to as the “Plan”). The “Plan” points out that it is encouraged to build a “cleaning power + Sugar daddy” project, and implement preparation and management of energy storage projects on the user side and power side; and wide free planning permits and construction permits for cabinet-type energy storage facilities projects.

Increase the construction requests for energy storage, photovoltaics and other projects, simplify the preparation process, and guide qualified enterprises to build new energy storage in accordance with the law.

The original text is as follows:

Notice of the Municipal Bureau Office on Printing the 2024 Innovation Implementation Plan for Optimizing Business Environment in Kunshan

Kunshan Development Zone and Kunshan Hi-Tech ZoneSugar baby, Huaqiao Economic Development Zone, and Tourism Resort Zone Management Committee, Nationalities Bureaus of all towns, various municipal commissions, and all direct units:

The “Kunshan City Optimization Business Environment 2024 Innovation Implementation Plan” has been approved by the 58th Regular Meeting of the Municipal Bureau and has been printed and issued to you. Please be sincere and implement it.

Office of Kunshan Municipal Government Bureau

June 23, 2024

(This document is publicly released)

Kunshan City Optimization Business Environment 2024 Innovative Implementation Plan

In order to deeply implement the decisions and arrangements of the national, provincial and Suzhou City on optimizing business environment, we will continue to polish the “Kunruyi” business service brand, create a market-oriented, law-based and international first-class business environment, and combine our city’s actual situation to prepare this plan.

1. Level of political service in Xiyang

1.Accelerate the promotion of “one thing at a time”. We will deeply promote the integration of more than 50 “one thing” including “efficient job” and optimize the “one thing” of enterprise opening, non-profit registration, and enterprise listing in compliance with the law and information verification, and realize “one form application, one set of data, one submission, and time-limited registration”. Optimized and upgraded enterprises have online “full link” to implement the use of electronics and enterprise management. The system of “chief representative” for political services is established, and no less than 350 political services are implemented. (Responsible unit: Municipal Data Bureau, Power Supply Company) 2. Strengthen data element support. Strengthen the management of enterprise-related data aggregation, build a group of furry little guys, holding it in terrible, and closing your eyes to match the theme database and topic database of the actual application scene, and unable to support the efficient and cooperative management of government services. Buy government-enterprise data sharing channels, make data classification and classification protection system, and orderly promote the sharing and opening of government data for enterprises, and help the development of data factor-based enterprises. Add no less than 40 new electronic license resources; implement 200 items “free”. (Office: Municipal Data Bureau)

3. Improve the approval and approval of investment constructionSugar daddy. Explore the transformation of Sugar daddy‘s corporate evaluation “up to once”. Promote the expansion of “work as soon as you acquire land” to ordinary industrial projects, real estate projects, municipal road conditions projects, and bureau investment projects. Implement the joint handling of fire inspection and pre-employment fire safety inspection in public buildings, and the compression time is limited to 10 task days, and “enter the venue together, check at the same time, and share the results.” Service methods such as “partial fire protection inspection and acceptance” and “partial completion inspection and acceptance” are issued, guiding enterprises to experience acceptance in different layers and fire prevention areas, and helping Sugar daddy industrial project “pre-test trial production”. (Responsible units: Municipal Data Bureau, Resource Planning Bureau, Housing and Urban-Rural Development Bureau, Fire Protection Team)

4. Optimize non-mobile registration. Relying on the “Denglucheng” platform, we will realize offline “one-window office” and online “one-network office”. Create “non-property registration + public certificate” service points, public certificate services for non-property registration and inheritanceWork “one stop”. We pursue the fast-tracking form of “release of loans and withdrawals when depositing” for enterprise-related statutory registration, and realize the “0 data” for the first time for enterprise-related registration. Implement “customization” and “certification upon completion” for non-operation registration of enterprises. (Responsible unit: Municipal Resource Planning Bureau)

5. Optimize project preparation governance. Encourage the construction of the “cleaning power + energy storage” project, and implement preparation and management of energy storage projects on the user side and power supply; and provide wide-free planning permits and construction permits for cabinet-type energy storage facilities projects. Encourage national capital to actively participate in the stake in existing assets, and implement preparations for the reform of old and old districts involved in old and small areas and the upgrading of investment projects such as industrial parks and industrial parks. Promote early start, complete and deliver business real estate projects, implement preparations for real estate projects (commercial and residential) that provide land, and promote the stable and healthy development of the real estate market. (Responsible units: Municipal Data Bureau, Housing and Urban-Rural Development Bureau)

6. Convenience of registration for individual transfers. If a personal business owner is transformed into an enterprise, you can apply for a change registration directly to the login to the login, and apply the number in the original business owner name according to the enterprise name. The original industrial and commercial enterprises have obtained administrative permissions in the market supervision area. Under the conditions that comply with laws and regulations and the content of the quality review and approval will not change, the relevant review and approval department will directly change the new certificate for it, or sign an opinion on the extension of the application of the old certificate. (Responsible unit: Municipal Data Bureau)

7. Promote policies to benefit enterprises and achieve immediate enjoyment. Continue to upgrade the list of “no application and enjoyment” for enterprise-related policies, and explore and promote the “one-point direct” policy within the list. The company has an intelligent and precise degree of enterprise-related services, integrating the “one dragon” package service for enterprise-related policies, and comprehensively implement policy inquiry, policy application, fund payment, and quick payment. (Responsible units: Municipal Financial Bureau, Science and Technology Development Service Center)

2. Strengthen factor support guarantee

8. Enforce the “data-gaining land” of manufacturing enterprises. Focus on a number of advanced manufacturing enterprises and improve land use guarantees for chemical industry. The “data land” rating system for existing manufacturing enterprises is established, and the comprehensive ranking of land use needs is carried out, and the company’s incomprehensive evaluation is carried out to solve the problem of enterprise land use. (Responsible units: Municipal Bureau of Industry and Information Technology, Resource Planning Bureau)

9. Promote the “Industrial Building”. Support enterprises to replace new data reforms, strengthen the development and application of three-dimensional disks, and encourage enterprises to replace new data trading activities with existing land by increasing capacity and increasing efficiency. For existing industrial land that does not change the reuse location, the land price will be increased by improving the land price and increasing capacity through factory flooring, removal and reconstruction, and old factory reform. Under the conditions of ensuring safety of production, public safety and environmental safety, industrial projects are encouraged to apply underground space construction and parking spacesand related supporting facilities; encourage industrial research and development land and high-standard factory land to build underground space. The underground space construction area built on industrial land does not include the above-ground capacity, and no underground space deposit is charged. (Responsible for Manila escort unit: Mu TC:

Leave a Reply

Your email address will not be published. Required fields are marked *