Sugar daddy Huaneng three electric factories have low-pressure cylinder zero-output reform bidding

requestId:687922fdc79d65.48632964.

Announcement on bidding for the reform project of the relevant low-voltage cylinder of low-voltage cylinders of Huaneng Southern United Power Independent Company’s relevant power generation unit low-voltage cylinders

(Tender number: HNZB2025-05-3-254)

Project location: Inner Mongolia Autonomous Region

1. Tendering conditions

The reform project of the relevant low-voltage cylinder of the China Southern United Power Independent Power Company has been approved by the project review and approval authority. The project funds are owned by the enterprise, and the bidder is the first hot power factory of the Southern United Power Independent Power Independent Power. This project has bidding conditions and public bidding is now underway.

2. Project Overview and Tendering Scope

2.1 Construction Location: Inner Mongolia Autonomous Region

2.2 Scale:/

2.3 Segment Segment: Huaneng Southern United Power Infinite Responsible Company Related Power Generation Unit Low-voltage Cylinder Zero Output Reform Project Section Package 1

2.4 Construction Location: Inner Mongolia Autonomous Region

2.5 Planning construction period: The total construction period of the project is 4 months. The construction drawing design is completed within 15 days after the contract is signed, the equipment is delivered within 45 days, the delivery progress meets the on-site construction request, and the construction is completed within 30 days. The daily start-up period is subject to the bidder’s notice.

2.6 Tendering Scope: Project Overview: 9 Nanfang United Power Infinite Responsible Companies, 9 units of the 21-unit Sugar daddy unit have entered the scope of reform of thermal energy flexibility in the entire district, carrying out new power consumption, with a total capacity of 6.72 million kilowatts. After the reform, a new adjustment capacity of 1.66 million kilowatts was added, and a new power of 1.66 million kilowatts was built. According to the “Inner Mongolia coal-fired electric motor is calling.” Only by reforming the organization’s flexibility can we experience the implementation of the collection supervision supervision system. We ask that after the reform of the coal-fired power generator set, we should conduct acceptance inspections. For generator sets with condenser power generation and thermal power joint methods, we should implement the acceptance inspection methods separately. In this case, the heat supply of the heat-electric motor group can be requested. “After the machine group reform, the actual heat supply should be guaranteed. In principle, the heat supply should reach the largest heat supply or application for heat supply during the coldest period last year.” For the peak adjustment of the machine set, please request that the annual operational output limit of the hot machine set shall not be lower than the parole indicator. Southern United Electric Song Wei was stunned for a moment, then pursed her lips and smiled, “Chen Jubai, you are so stupid.” The company’s unlimited responsibility is the first to be the first.babyHot power plant No. 2 machine set. , the second hot power plant of BaotouSugar daddy No. 1, 3, and No. 4 of Urat Electric Power Plant, are carrying out the reform of low-pressure cylinders for automobiles to meet the demand for thermal supply during peak periods.

Tender scope: This project adopts the EPC general contracting method, and the bidder is responsible for the tasks of efficiency design, supply, manufacturing, transportation, installation, commissioning, functional experiment, final delivery and after-sales service required for the zero-output reform of low-voltage cylinders.

For specific content, please refer to the technical specifications of bidding documents.

3. Investor qualification request

3.1 General qualification conditions

3.1.1 The investor is an independent legal person or other organization registered in the People’s Republic of China that complies with the laws and regulations. He has the ability to independently bear responsibility and has the right to establish a contract independently;

3.1Sugar daddy.2 The following conditions shall be required for the bidder’s financial, trustworthiness, etc.:

(1) It has not been held in the law of suspending, suspending business or breaking the industry by the administrative department;

(2) It has not been found in the relevant documents of the administrative department or the China Energy Group Co., Ltd. system.Sugar daddy‘s scope and period for stopping bids;

(3) In the past three years, the China website has not approved the same bid or has obtained the winning bid or severely charged bill record, and has not changed or severe quality caused by the construction as recognized by relevant departments. Safety changes;

(4) It has not been listed in the national enterprise trust information disclosure system by the market supervision and governance department. It has been severely illegally removed from the list of enterprises or abnormal business names;

(5) It has not been listed by the Supreme People’s Court on the “Reputation China” website (.cn) or various levels of lettersSugar babyThe list of letter executioners is listed in the honorary information sharing platform.

(6) A legal person, other organization or individual who has a short-term relationship with the bidder can affect the fairness of the bidder, shall not participate in the bidding; a unit responsible person shall not participate in the bidding as a unit or a disagreement unit that may have a controlling or governance relationship.Target bids for bids in the bids or a unified bid project that may not be planned for sub-tags.

3.2 Special qualification conditions

3.2.1 Qualification request: Sugar daddyThe bidder must have the second or above overall contract for power engineering construction issued by the administrative department and the engineering design of power industry firepower power generation (including the common island design of nuclear power stations) professional grade B or above.

3.2.2 Qualification Title Request: The bidder has a safe production license issued by the administrative department and is within the useful period.

3.2.3 The project manager of the bidder shall have a second-level or above registered construction engineer certificate (mechanical engineering professional) and a useful Class B safety production inspection and qualification certificate; it shall be provided to the project manager for 6 consecutive months of social security deposit certificate in the bidder unit (or unit of a joint member unit) in the past year.

Registration Note: If you are required to provide an electronic version certificate to a first-level registered construction engineer, after printing the electronic certificate, you should manually write your own signature in the personal signature. If you do not write a signature manually or have different contradictory relationships with the signature image, the electronic certificate will be invalid.

3.2.3 Business results request: The bidder must have a maximum order of 1 year (the contract is January 1, 2015 to present) and she remembered that these people are recording the knowledge competition programSugar baby, she is a general contract contract for the reform of the EPC contract with a low pressure cylinder with a capacity of 300MW and above. Attached is a photocopy of the contract keyword (including the contract homepage, project name, contract scope, machine capacity, reform plan, signing time and signing stamp page, etc.). If there is no reform plan in the contract, it must be provided to the technical agreement keyword page and other certification information. It is also provided to the settlement value-added tax invoice or the staged payment invoice (the business unit can provide the surcharge certificate), otherwise the performance will be processed as invalid performance.

3.2.4 This project accepts joint bids. The joint bids must sign a joint agreement book, and clearly confirm that the joint leaders and each party have the rights and interests, and there are no more than 3 joint members.

4. Acquisition of bid documents

Acquisition time: Sugar daddy starts from 9:00 on May 23, 2025 to 17:00 on May 30, 2025.

Getting method:

4.1 Download and install the bidding manager: the bidder downloads and installs the bidding manager on the “Service Intermediate–>Download Zone” of the Huaneng Group E-commerce Platform homepage (https://ec.chng.com.cn).

4.2 Purchase: Buy bid documents online during the sale period of bid documents. Log in to the bidder and select the project to purchase documents.

4.3 Contact: The bidder must fill in the business contact for this bid on the purchase bid document page. The notices of the bidding, clearing, and review period will be sent to the Sugar baby contact mobiSugar daddyle_phone in the bidding period.

Manila escort