On July 11, a bid notice for the main construction safety project of Bayuan County, Heilongjiang was issued. The details are as follows:

Announcement for the main construction safety project of Bayuan County, Heilongjiang.

Tender number: FJ0112G250605001001

1. Tendering conditions

This bidding project has been approved by the Heilongjiang Provincial Development and Reform Commission with the document No. 779 of the Black Development and Reform Power [2022]. The funds of the project have been in place. The construction funds are owned by 20% of the enterprises, and 80% are loaned to the bank by the enterprises. The bidder is Bayuan County Shenneng Environmental Protection Co., Ltd., and the bid representative agency is Heilongjiang Rihua Engineering Project Governance Co., Ltd. The project has already met the bidding conditions and public bidding is now being carried out for the main building installation project of the project.

2. Project Overview and Tender Scope

2.1 Project Name: Ba Happiness is so sudden. The main construction and safety project of the Shengxian County Life Slag Burning and Electric Power Generation Project

2.2 The construction scale of this project: The total air volume of the factory area is 60,000 square meters, of which: the air volume of the first phase is 40,210.51 square meters, and the air volume of the second phase is 19,789.46 square meters.

Total construction area of the whole factory: 17251.26 square meters

Total construction area of the main factory: 12501.09 square meters

Single cylinder natural cycle residual heat boiler: Daily fixed steaming Manila escort 31.1t/h (Sugar baby450℃, 6.4MPa) residual heat boiler, vertical structure, water supply temperature 140℃, and smoke discharge temperature 180℃~210℃.

Smoking treatment line: A helping hand was adopted. “SNCR furnace internal nitrition + semi-dry ionization + dry powder spraying system + activated carbon spraying adsorption + bag debrisizer” smoke chemical industry.

Electrical generator

Electrical generator type: automatic magnetic wind-cooled type

Number of quantity: 1 platform, equipped with the motor

Transfer speed: 3000r/min

According voltage: 10500V

Frequency: 50Hz

Electrical magnetic method: Microcomputer dual channel self-parallel brushed magnetic system

Electrical cooling method: Close circulation air coolingSugar baby2.3 Construction location:2.4 Planning Period:

Owner “Hey, that’s a matter of time.” Zhengju photographed the child beside him. “The total construction period of the construction of the physical construction and safety project is 503 days (including 1 winter break period: November 15 to March 15 of the following year). The plan will start on August 15, 2025 (based on the supervision and start construction order), and the residue will be removed on August 30, 2026; on December 30, 2026, the Yucheng Factory will be completed for 72+24 hours. href=”https://philippines-sugar.net/”>Escort factory handed over to the trial production.

The above construction period specifications are subject to contractual orders.

2.5 Quality standard: passing standard;

2.6 Tender scope:

Construction Engineering Department: All buildings within 1 meter of the red line scope for this project are mainly included in the following Sugar baby Content (but not limited to):

(1) Main factory, ventilator room, smoke online detection room, smoke foundation and burial and loading ramp;

(2) Comprehensive water pump room, sewage treatment station, closed torch, wind cooling tower, production/fire tank, ammonia tank area, oil tank area, flying ash maintenance room;

(3) Floor scale foundation, floor scale room/sewage online detection room, mutated oil tank, door room/fire control room, early rainwater pump station (including early rainwater collection pool) ), rainwater pump station (including rainwater collection tank), sewage pump station, sewage online monitoring Bachelor trough, sewage temperature reduction tank, environmental monitoring well, indoor drainage;

(4) Fire protection, heat-gas ventilation, electric lighting, electric (window, lightning protection, electric air ), stolen control (fire alarm, telephone network, door-ban security, industrial television monitoring);

(5) integrated pipe frame, factory route (including connection routes and drainage lines from logistics, people-to-peer channel red lines to outside the field), and the whole factory integrated pipe network;

Sugar baby

Detailed engineering scope and interface details Technical specifications book Annex 23 “Task scope and boundary and interface”.

Installation Engineering Department: All equipment and system installation projects in this project scope are responsible for the collection, storage and installation by the bidder (by Manila escortThe equipment and systems that the supplier entrusts the supplier to install and practice, and the bidder is responsible for the goods and storage on behalf of others), and all interfaces are responsible for the bidder.

Including all contents of the bill of quantities, drawings and technical specifications.

2.7 Segment Segment: Non-segment Segment

2.8 Tender Control Price: Finally, it is released with clarity

3.Pinay escort Investor qualification request

3.1 The bidder must be a registered enterprise legal person (independent legal person) registered in the People’s Republic of China, and have the right to independently sign a contract to provide useful business licenses. It must have the third or above general contracting of power engineering construction issued by the construction administrative department, have useful safe production licenses, and have Sugar in terms of personnel, equipment, funds, etc. baby has corresponding performance skills.

3.2 For this bidding, the bidder requests that the project manager shall have registered a professional certificate for the first-level mechanical and electrical installation engineering or the first-level construction engineering professional construction engineer, and a useful Ping An Production Inspection and Qualification Certificate. He has not been appointed as the project manager of other construction engineers. The project manager has not had any safety changes. (For nearly 3 months (January 2025 to March 2025), the company has certified its social security payments by it, The social insurance certification certificate must be issued by the local social security agency or printed on the social security department website), the guarantee certificate data is real and useful. The bidder will check whether the social insurance of the reporter can be authentic. If the relevant information is not found, the bid will be denied. If it is found that the fake will be revoked, and the bid will be provided to the proof of peace change, and the pattern will be self-disclosure.

3.3 Assign project management organization to provide assistance requests: 1 technical responsible person (with intermediate or above professional qualification certificate for construction engineering related), 1 construction worker (with useful professional construction worker position certificate or professional qualification information for construction engineering related projects. Electronic certificate), 1 quality member (with useful professional construction worker position certificate or professional talent information electronic certificate), 1 safety member (with useful safety production inspection and qualification certificate), *1 standard member, *1 data member, *1 machineryManila escort member, *1 service member, *1 data member. Note: Technical responsible persons, construction personnel, quality in project governance institutionsMembers and security personnel must have useful position certificates or industrial information information electronic certificates, and after winning the mark, the management system will be locked in the construction site management system. Standards, data staff, machinery staff, personnel, data staff, etc. do not need to provide position certificates, and other personnel can serve on the same job as requested. Content tags: A combination of heaven, Sugar babySugar baby industry elites, sweet articles, and people who love to marry first and then love to take part-time jobs can have part-time jobs, but part-time jobs must not exceed 2 positions.

3.4 From January 1, 2015 to the daily day of the bidding period (based on the time of the project handover or the completion of the project Sugar daddy construction time), the bidder shall undertake at most one unit with a capacity of 300MW or more fired or a single furnace not less than 400t/d mechanical furnace exhaust furnace residue power generation factory main construction installation project; (Certificate Sugar daddy document: copy of the certificate documents for the performance contract and the transfer of production certificate (or completion acceptance report), and add the bidder’s official seal or electronic seal. The document must clearly define the project handover produc TC: