The Beijing Municipal Government Bureau issued the Beijing Municipal Government’s “14th Five-Year Plan” period’s serious basic facilities development plan, which mentioned that the force guarantee system was doubled. Create a reliable and reliable urban network. The local and surrounding areas of power supply facilities are laid out, and the external power supply channels are continuously perfect, the urban power network structure is optimized, the local power supply emergency installation and peak power construction are strengthened, and a high-reliable intelligent urban distribution network is built. Promote the construction of the Xuanli (Xi League)-Zhangbei ultra-high pressure channel, form the Beijing ultra-high pressure network, accelerate the construction of the Beijing East-Tongzhou North, Beijing West-Xinhangcheng 500 kV downstream channels, and advance the Beijing Internet’s external power receiving ability. Plan to build 5 500 kV transformer power projects, including Yizhuang and CBD, and build 29 new 220 kV transformer power stations, accelerating the replenishment of network distribution networks in single areas such as key urban burden areas and old small areas. By 2025, the power transmission of the transmission channel will increase to 43 million kilowatts, and the city’s power supply occupancy rate will reach 99.996%. The full text is as follows:
Beijing Municipal People’s Administration’s notice on issuing the “Beijing’s “14th Five-Year Plan” Serious Basic Facilities Development Plan”
Beijing Government Development [2022] No. 9
National Bureaus in all districts, committees, offices, bureaus of the municipal bureaus, and municipal agencies:
The “Beijing “14th Five-Year Plan” Serious Basic Facilities Development Plan” will be printed and published to you. Please be honest and implement it.
Beijing Municipal People’s Administration
February 22, 2022
Beijing’s “14th Five-Year Plan” period of the severe basic facilities development plan
Media
The 14th Five-Year Plan period is the first five years after our country has fully built a moderately prosperous society and realized the first century-old goal, and has taken the lead in launching a new journey of building a modern socialist country and advancing towards the second century-old goal. As the capital, Beijing must be at the forefront of the country in the new development stage of the struggle, fully, accurately and comprehensively integrate new development concepts, actively serve and integrate new development formats, and put forward higher requests for the development of basic facilities in the city.
Basic facilities such as road conditions, water, power, garden greening and municipal affairs are the main support for economic and social development, and are strategic, basic and leading-edge. Promoting the high-quality development of basic facilities is the main guarantee for implementing the strategic positioning of the First China urban and building an international first-class harmonious and livable capital.
The Beijing Municipal Government’s “14th Five-Year Plan” Serious Basic Facilities Development Plan” (hereinafter referred to as the “Plan”) is based on the “Beijing Urban General Planning (2016-2035)” and “Beijing Economics and Society href=”https://philippines-sugar.net/”>Escort will develop the 14th Five-Year Plan and the 2035 Far Goals” and other compilations. It is a key planning plan for the city’s “14th Five-Year Plan” planning system. The system summarizes the foundation for the “13th Five-Year Plan” period. The development results of the facilities are comprehensively analyzed, and the development situation of the basic facilities during the 14th Five-Year Plan period was proposed, planning thinking, important tasks, and guarantee measures were proposed. The construction plan for the “14th Five-Year Plan” period was compiled in accordance with the requests of list-based governance and project-based promotion. It refers to the action guide for the construction of basic facilities in the city during the 14th Five-Year Plan period.
1. Planning and Plan
(I) Development Foundation
The 13th Five-Year Plan period is a five-year period with major milestones in the history of Beijing’s development. Faced with the miserable international situation and the impact of the COVID-19 epidemic, the city deeply studied the general secretary of General Jinping’s series of major speeches on Beijing, and earnestly implemented the Beijing-Tianjin-Hebei joint development strategy and the “Beijing Urban Planning (2016-2035)” to tightly focus on the construction. What kind of capital is, how to build a capital?” This serious era subject is fully promoting the development of the capital, reducing development, innovative development, green development and the development of the people in the middle. Urban development is undergoing in-depth transformation, and the development of basic facilities has begun a new stage of advancement to high quality. Over the past five years, the city’s basic facilities investment has accumulated by 125.685 billion yuan, which is 1.4 times that of the 12th Five-Year Plan period. A number of serious basic facilities projects have been completed and invested, so that the city’s comprehensive undertaking of basic facilities can continue to improve.
1. The key areas of the coordinated development of Beijing-Tianjin-Hebei region have been the first to break through. The road situation has been the first to break through and achieved new progress. The regional road conditions have been deeply promoted, the Beijing International Airport has been successfully completed and put into operation, and Beijing has entered the “dual New Year” era of aviation. Beijing International Airport Expressway, Road Conditions and other supporting backbone road conditions projects have been put into use simultaneously, and the infrastructure of comprehensive road conditions outside the airport has been formed. The construction of the “Beijing-Tianjin-Hebei on the Trail” has been accelerated, and the layout of the railway passenger transport routes has been gradually improved. The Beijing-Shenzhen-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong-Hong Kong- The “one-hour road circle” in the capital has gradually expanded. The Beijing-Taiwan Expressway, the Beijing-Qinqin Expressway, the Capital Regional Ring Expressway (Tongzhou-Big Section) and other vehicles have been built. The total mileage of expressways has reached 1,173 kilometers. The national expressway network in the city has cleared the “blocking road”.
The ecological field is the first to break through and achieve new progress. The key ecological engineering war has accelerated the advancement of original afforestation, completed 1 million afforestation tasks, implemented 400,000 Beijing-Hebei ecological water source forest construction, completed 1.22 million regressive forest stand reform in the Shang area, supported the ecological construction of Xiong’an New Area, and completed 40,000 afforestation and greening in Langfang, Baoding and other places. We have worked together to promote the joint water control in all aspects. The western water supply channel has been officially opened. The motherland’s mother river and the Yongding River of Beijing are connected by historic connections. The dry roads in Beijing, Tianjin and Hebei are connected by dry roads. The capital’s water resource guarantee format is accelerated. We will actively promote cross-border river management, complete projects such as the management of the plain section of the Beijing border of the Juma River, comprehensive management and ecological repair projects of the Yongding River were fully launched, and the construction of the comprehensive management project of the Beihang River (Tongzhou Section) was started. The aquatic ecological environment of the border river section was constantly improved, and the outbound outage was completely eliminated. In cooperation with th TC:sugarphili200