requestId:68767fc4372559.55169054.
On January 4, Zhejiang Water Conservancy Bureau issued a lawsuit against Zhejiang Province’s Small Water and Electricity Control Regulations. This law is suitable for the planning, development, construction, operation, technical reform and reporting of hydropower projects with a capacity of less than 50,000 kilowatts in a single station installation capacity of less than 50,000 kilowatts in the administrative region of this province. Hydroelectric projects such as tidal, pumped storage, etc. shall be carried out in accordance with relevant national and provincial regulations.
Zhejiang Water Conservancy Bureau’s notice on the issuance of Zhejiang Province’s small water and electricity management regulations
Zhejiang Water Conservancy Bureau’s notice on the issue of Zhejiang Province
All cities and cities, Sugar daddy County (a male actor of similar age in the city and district. The other three are middle-aged men.) Water Conservancy (Human and Electricity, Water Affairs) Bureau: In order to strengthen small water and electricity management and ensure safety in operation and public safety, our office has revised the “Zhejiang Province Small Water and Electricity Management Regulations” and will be published and distributed to you. Please be honest and implement it.
Zhejiang Water Conservancy Hall
December 29, 2023
Zhejiang Province Small Water and Electricity Management Measures
1. General
(I) In order to strengthen small water and electricity management, ensure safety in operation and public safety, ensure sustainable application of water energy resources, promote the construction of ecological civilization, and promote the Internet Economic and social development can continue to develop, and in accordance with relevant laws and regulations such as the “Water Law of the People’s Republic of China”, “Safe Production Law of the People’s Republic of China”, “Safe Manufacturing Law of the People’s Republic of China”, “Safe Governance of Water Conservancy Engineering in Zhejiang Province”, “Zhejiang Province Renewable Dynamics Development and Application Promotion Regulations”, and “Zhejiang Province Water Resources Regulations” and other relevant laws and regulations, this regulation is formulated in accordance with the actual situation of this province.
(II) This regulation is applicable to the planning, development, construction, operation, technical reform and waste management of hydropower projects with capacity of 50,000 kilowatts in the administrative area of this province.
Hydroelectric projects such as tidal, pumped storage and other hydropower projects shall be implemented in accordance with relevant national and provincial regulations. Sugar daddy
(III) The principles of implementation planning for small water and electricity management, fair application, system management, green development, safe and efficient, and local responsibility.
(V) The competent water administration department at the county level shall strengthen its guidance on the small water and electricity industry associations and exert the positive influence of the small water and electricity industry associations in policy publicity, industry self-discipline, technical services, business training, information and transportation.
2. Planning and construction governance
(VI) The competent water administration department at the county level and below shall carry out the survey and evaluation of small water and electricity resources in its administrative area in accordance with the regulations, analyze the development and application conditions of small water and electricity resources and the impacts generated, and propose and adopt corresponding measures.
(VII) The small water and electricity development plan shall be based on county level. The water administration department shall organize or revise the organization and submit the approval of the national government bureau after soliciting opinions from relevant departments at the same level to implement it after soliciting opinions from relevant departments.
The development and application of small hydroelectric resources shall be appropriate for the small hydroelectric development plan. The small hydroelectric development plan shall serve the comprehensive planning of the basin, regional comprehensive planning, and be opened with renewable power The development and application planning, domestic space planning and environmental protection planning are connected to flood control, water supply, irrigation, ecological and aviation protagonists: Song Wei, Chen Jubai┃Supporting role: Xue Hua┃Others: Corresponding to industrial needs.
(8) Small hydroelectric development planning should be strictly implemented once agreed. The agreed planning needs are repairedWhen ordering, the French original consent department shall be approved by the original consent department in accordance with the planning.
(9) Sugar daddy small water and electricity construction projects (including new construction, re-establishment, and re-investment and re-establishment of the law) shall be implemented, and the approval (approval) and preparation procedures shall be handled in accordance with the rights and regulations of the state and provincial regulations.
(10) The approved (approved) small hydroelectric projects will carry out serious design changes and change the construction tasks of engineering projects or may be combined. If the primary and secondary sequence, engineering grade, important hydrological parameters and results, construction sites, large-scale stents and modification stations used by baby have a total installation capacity of more than 10%, the department with approval (approval) authority shall be approved from the head.
(11) Small water and electricity construction projects should implement the prescribed construction rules, implement the water conservancy project construction and governance system, implement the project legal person responsibility system, bidding and investment system, construction supervision system, and contract governance system.
(12) The exploration, design, construction and supervision of small water and electricity construction projects shall be undertaken by units with corresponding qualifications, and the water administration department below the county level shall supervise and govern the project quality and safety in accordance with the law.
(13) Small hydropower construction projects shall be subject to the organizational acceptance of the “Examination and Acceptance Procedure for the Construction of Small Hydropower Stations” in accordance with relevant national regulations and water conservancy industry standards. If the acceptance is not experienced or the acceptance is not subject to any disparity, the construction or application shall not be carried out in the next stage of construction or may be applied. Escort
3. Operation Manila escortGovernance
(14) Small hydropower production management units shall implement the safe production responsibility system, set up safe production management institutions, provide professional or part-time jobs in safe production management personnel in accordance with the law.
The small hydroelectric production unit is the responsible body of Ping An Production. Its legal representative is the first person responsible for Ping An Production of this station.
Small hydropower production management units should establish and improve daily maintenance, safe operation, and emergency handling regulationsRegister, prepare and implement emergency plans and flood prevention regulations, and strictly implement them.
(15) The water administration department shall have the responsibility for supervising and governing the safety management of small water and electricity stations, and shall announce the responsible persons responsible for the safety management of small water and electricity stations to the public in accordance with regulations.
(16) Small hydropower production units shall provide safe education and training for hydropower stations from employees, and inform the business premises and mission positions of the cause of crisis, prevention measures and emergency measures. Employees who have not passed the safety production teaching and training are not allowed to go to the office.
(17) Small hydropower stations implement stan TC: